Shakedown Cruise
Is a nautical treem in which the performance of a ship is tested. Generally, shakedown cruises are performed before a ship enters service or after major changes such as a crew change, repair or overhual. The shakedown cruise simulates working conditions for the vessel, for various reasons. For most new ships, the major reasons are to familiarise a crew with a new vessel and to ensure all of the ship's systems are functional. A vessel is typically not committed to any timetables or tasks until it completes its shakedown cruise. As such, problems detected during the shakedown cruise can be fixed at minimal cost.
If the ship is the first of its class, it will likely also be performing its sea trials, a test of its performance. In this context, 'shakedown cruise' and 'sea trials' may be used interchangeably, though each has a slightly different meaning. In such a case, it is likely that the ship's systems will be pushed to redline, or maximum capacity, to demonstrate the class's speed and other important traits. Until bested by another ship of the same class, this shakedown performance will be the standard of the class's capabilities, and its success may determine whether the class is to enter full production.
In the travel industry a shakedown cruise is not only undertaken to test the ship, but also the service crew. These test cruises are sometimes made with passengers travelling at a discount.
It has been suggested that the origin of “shakedown cruise” comes from the need to settle (or literally shake down) the ballast in the hold of a ship to ensure it is level in the water. However, this would only apply to very granular ballast material such as sand. The term is more likely to have arisen due to the transition from sail to power. The advent of engines within the hull of a ship caused severe vibration. Such vibration would be aggravated by uneven running and different sea conditions. A new ship had many fixtures and fittings throughout its accommodation and work spaces. As the maiden voyage progressed, these would become loose, and in many cases fall to the deck (shaken down). For this reason, it was common for the shipyard to send a 'shake-down' team with the ship on her maiden voyage. These men would be specialists equipped with the proper tools and spares to relocate or replace any shake-down displaced fixtures or fittings.
The term can also refer in a generic sense to the process of testing out any new technology or system.